BAIC Zhenjiang BE21 Platform Upper Body Welding Project

Project Name: BAIC Zhenjiang BE21 Platform Upper Body Welding Project

Project Location: Zhenjiang

Customer Standard: SICAR templates

Production Line Information: Main Line, Lower Body

Takt Time Requirement: 30 JPH

OEE Requirement: 90%

PLC Brand and Model: Siemens 1500 Series Smart200

PLC Software: T-PTO

Main Processes: Medium-frequency spot welding (side panels), SPR riveting (floor line and main line), FDS riveting (floor line and main line), press riveting, stud welding, robotic flanging (main line), robotic adhesive application, robotic vision-based in-line measurement (main line)